Complete Guide to Renovation Timeline Planning

March 2, 20241 min read
Complete Guide to Renovation Timeline Planning

Importance of Renovation Timeline

Proper renovation timeline planning is as important as budget determination. A realistic schedule will help you avoid stress and additional costs.

Renovation Stages and Their Duration

1. Demolition (3-7 days)

Removal of old covering, doors-windows, and plumbing. Duration depends on the size of the area.

2. Engineering Works (7-14 days)

Electrical wiring, plumbing, air conditioning. This stage requires special precision.

3. Wet Works (14-21 days)

Wall preparation, plastering, leveling. Time is needed for drying.

4. Covering Installation (7-14 days)

Floor installation, tile laying, wallpaper or painting.

5. Furniture Installation (3-7 days)

Kitchen, wardrobes, and other furniture installation.

Factors Affecting Timeline

  • Size and condition of the space
  • Complexity of work
  • Material availability
  • Season and weather

Tips for Meeting Deadlines

Order materials in advance, agree on a clear schedule, and regularly monitor the process.